Designed by the internationally recognized firm Rafael Viñoly Architects, the new 824,000-square-foot facility opened in 2019. Over a 5-year period, CMF engineered, designed and installed architectural metal panels, louvers, grills, expansion joint systems and general sheet metal throughout the hospital and parking garage.
"*" indicates required fields